Installation of 26 Way Domestic Fuse Board

One of the largest single domestic installations Prolectrical Limited have carried out in recent times.

Three existing and outdated fuse boards were removed and amalgamated into one main 18th edition fuse board with full RCBO and surge protection. Each circuit cable feeling into the board needed extending, as the original cables were too short, requiring floor boards on the landing above to be removed and a series of junction boxes installed to accommodate the new connections. This installation was a particularly complicated process as the images show.